ACTIVE PROJECT STARTER · MPRL-AI-TSAD-01

Robust industrial anomaly detection—after the benchmark.

A 14-day entry pilot for a prospective research contributor. The goal is not to repeat a tutorial: it is to test whether a newly published foundation-model result survives a deployment-faithful industrial evaluation.

WHY THIS IS AN ACTIVE PROJECT

Three forms of evidence—not a label.

01

Fresh research

The base paper was released in May 2026 and accepted at IEEE INDIN 2026. Its official code repository was still receiving updates in August 2026.

Official ChronosAD code ↗
02

Unresolved disagreement

Recent work does not agree on when foundation models beat simpler methods, how much compute they justify, or how reliably they control false alarms under shift.

Read the counter-result ↗
03

A testable next step

We can add a multivariate process benchmark, keep runs and time separate, choose thresholds without test labels, and measure false alarms and detection delay—not only headline AUC.

Tennessee Eastman data ↗

RESEARCH LINEAGE · 前人工作

Where the project comes from—and where it moves next.

This sequence shows a live research conversation: a new model family, conflicting evaluation evidence, new calibration methods, and fresh industrial applications.

  1. MOMENT opens the foundation-model direction

    The ICML paper introduced an open family of general-purpose time-series foundation models and described evaluation under limited supervision as a still-developing benchmark problem.

    ICML · PMLR ↗
  2. A benchmark raises a serious counter-result

    A study accepted to the AAAI 2025 Anomaly Detection in Scientific Domains Workshop reported that traditional statistical and deep-learning methods can match or outperform time-series foundation models while using fewer resources.

    AAAI workshop · arXiv ↗
  3. Adaptive conformal calibration targets false alarms

    IBM researchers proposed a model-agnostic post-hoc method designed to keep anomaly alarms calibrated under distribution shift, with public implementation materials.

    Paper · arXiv ↗
  4. ChronosAD reports strong cross-domain performance

    ChronosAD, accepted at IEEE INDIN 2026, combines zero-shot Chronos embeddings with a temporal block and reports gains across 11 industrial, medical, cyber-physical, and automotive benchmarks.

    IEEE INDIN 2026 · arXiv ↗
  5. MOMEMTO keeps the over-generalization question open

    The 2026 TMLR work adds patch-level memory to a foundation model to reduce reconstruction of anomalies, but evaluates univariate benchmarks—leaving multivariate industrial process behavior open.

    TMLR 2026 · arXiv v4 ↗

THE OPEN QUESTION

Does the advantage remain when the evaluation looks like deployment?

ChronosAD is the starting point because it is recent, relevant, and reproducible from public code. Its current implementation shuffles examples, performs a stratified random split, and derives an “optimal” threshold from the test-set ROC curve. That supports reproduction of the published classification setup, but it leaves a practical question open.

Inspect the starting implementation ↗
PROPOSED STUDY

Deployment-Faithful Evaluation of Time-Series Foundation Models for Industrial Process Anomaly Detection

Base
Reproduce a documented ChronosAD slice.
Extend
Add held-out Tennessee Eastman process runs and fault types.
Correct
Use chronological/run-level partitions and validation-only thresholds.
Compare
Isolation Forest, PCA reconstruction, ChronosAD, and an optional conformal-calibrated variant.
Measure
AUC-PR, AUROC, false alarms per hour, detection delay, stability across fault types, and compute cost.

The contribution is the protocol and evidence—not a promised win. A careful negative result can still be valuable.

14-DAY ENTRY PILOT

Earn the next research question by doing the first six tasks well.

The pilot tests research habits before the full project is assigned. Submit work as plain-text files, notebooks, figures, and a short verbal walkthrough.

01DAY 1–2

Write the fit note

In 300–500 words, explain which part of the question interests you, what you already know, what you need to learn, and the hours you can protect each week.

DELIVERABLE · fit-note.md
02DAY 2–4

Build the literature matrix

Read the five works in the research lineage. For each, record its claim, dataset, split, metric, available code, limitation, and one possible extension. Separate what the authors show from what you infer.

DELIVERABLE · literature-matrix.csv
03DAY 4–7

Reproduce one small ChronosAD run

Use the official repository, record the exact commit and environment, run one manageable benchmark slice, and report the result even if it differs from the paper. Do not change the code until the first run is logged.

DELIVERABLE · reproduction-note.md + experiment log
04DAY 8–10

Audit the industrial dataset

Inspect the Tennessee Eastman data structure, fault timing, simulation-run identifiers, variables, licensing, file sizes, and train/test generation. Propose a split that prevents windows from the same run crossing partitions.

DELIVERABLE · dataset-audit.md
05DAY 10–12

Build a leakage-resistant baseline

Train a simple detector on fault-free runs, set its threshold on validation data only, and evaluate on held-out runs. Start with Isolation Forest or a PCA reconstruction baseline before adding a foundation model.

DELIVERABLE · baseline notebook + three figures
06DAY 13–14

Propose the full experiment

Write a two-page memo defining the research question, hypothesis, comparison table, metrics, compute budget, risks, and the smallest result that would still be informative.

DELIVERABLE · research-memo.md + 10-minute walkthrough

STARTER PACK

Templates for work we can actually review.

Download these files into one project folder. Keep raw data unchanged, record every experimental decision, and link every claim to a source or result.

GO / NO-GO REVIEW

What must be true before the full paper-track project begins.

Passing the pilot means the project is technically and behaviorally ready to continue. It is not a publication decision.

  1. 01The first result is reproducible from a clean environment.
  2. 02Data partitions are defined by process run or time—not by shuffled, overlapping windows.
  3. 03Thresholds and model choices are fixed before the held-out test set is examined.
  4. 04Negative or conflicting results are documented instead of hidden.
  5. 05The candidate can explain the method, code, metrics, and limitations in her own words.
  6. 06A realistic weekly commitment and compute plan are agreed before the full study begins.

AUTHORSHIP & OUTCOME BOUNDARY

A paper is a target. Authorship is earned through contribution.

The full project may aim toward a manuscript, workshop paper, poster, or reproducible technical report. Co-authorship is considered only after substantive contribution to the research design, implementation, analysis, interpretation, and manuscript—and after the contributor can defend the work. Fees, if any, pay for training or mentorship; they do not purchase authorship or acceptance.

Read the Lab standards Ask a project question